How we work
From a first conversation to a commissioned, rehearsed shelter. Every project gets a fixed, written quotation before any construction starts.
From enquiry to aftercare
Most builds take 4 to 14 months after approval, depending on size and ground conditions. See the stage-by-stage timeline.
- Day 1
Confidential enquiry
A two-minute form. We reply within two working days.
- Week 1
NDA and first call
An engineer discusses your needs, the honest limits of protection, and the likely class. No charge.
- Weeks 2–4
Site assessment
Soil and groundwater testing, access, utilities, approvals and the best location on your land.
- Weeks 4–10
Design and fixed quote
Engineer-signed structural design, life support, layout, escape routes and cover function, with a fixed price.
- Varies by city
Approvals
We prepare and manage the building approval package with your architect or ours.
- 4–24 months
Build
Excavation, waterproofing, reinforced concrete, blast doors, services and fit-out, with stage reports.
- 2–4 weeks
Commissioning
Pressure test, filter test, power and cooling at full load, water quality, alarms and doors.
- Final week
Handover and first drill
Your written protocol, a full drill and training for every adult.
Payment stages
| Stage | Share |
|---|---|
| Contract signing | 15% |
| Excavation and waterproofing | 20% |
| Structure complete | 25% |
| Doors, air, power, water installed | 25% |
| Commissioning and handover | 15% |
Typical schedule. Bank transfer with GST invoices.
Maintenance
A shelter that is not maintained will fail when it is needed. Every handover includes the option of a maintenance plan: Essential, Assured or Total, with seasonal visits, stock rotation, filter and power checks, and guided drills.
What shapes the cost
Every shelter is custom, so we do not publish prices. These are the factors your quotation is built from. More detail in what decides the cost of a bunker in India.
Size and autonomy
How many people, for how many days. This sets floor area, water, fuel and stores.
Protection level
Earth cover, wall thickness, blast rating and the air system level.
Ground conditions
Rock, clay or a high water table change excavation and waterproofing.
Site and access
Open land is simpler than a tight urban plot or an existing building.
Timing
Building alongside a new project costs less than retrofitting.
Finish and options
Fit-out, cover function, medical bay, tunnels and redundancy.
Where we work
Anywhere in India where the site, ground and approvals allow.
Most enquiries come from Delhi NCR, Mumbai, Pune, Bengaluru, Hyderabad, Chandigarh, Punjab, Rajasthan, Gujarat and the hill states. We also work with people based abroad who want a shelter at a property in India.
Get a quotation for your site.
Start with five questions. We take it from there.